Time scheduling

Post by up642494 »

Hi there,
I am modelling a distribution centre in which lorries arrive between 7AM - 3PM and forklifts operate between 830AM - 5PM. I have connected the time schedule and availability control atoms to my product at the start, with the time scheduling table saying:

Time Down
hr(0) 0
hr(8) 1

However the model is still producing products after 8 hours. Is there a 4DS script you have to input into the triggers section of the availability control to stop producing products?

Thanks very much

Dan Lumb (MSc Student at the University of Portsmouth)
up642494
Posts: 10
Joined: Tuesday 13 November, 2012 - 18:23

Re: Time scheduling

Post by up642494 »

Hi sorry, again another mistake I had it connected to the product not the source and now it is working fine :) . Now to try the forklifts!

Dan
up642494
Posts: 10
Joined: Tuesday 13 November, 2012 - 18:23

Re: Time scheduling

Post by up642494 »

success! :)