Modelling a production line with two advance transporters

All topics specific to modeling questions in Enterprise Dynamics
Post Reply
slimmdree
Posts: 13
Joined: Wednesday 29 February, 2012 - 13:55
Contact:

Modelling a production line with two advance transporters

Post by slimmdree »

Hi Guys,

I have modelled a production which use two advanced transporter to pick up products, but whenever i run the programme it gives me an error message : 4DScript:error at ''Do''access violation at address 00812318 in module 'ED.exe'. Read of address 000001D5. i do not understand it and when i click on OK the transporters doesnt move....you can check it out on the attachment.
Transporter3.mod
(59.19 KiB) Downloaded 347 times
.

Thanks
Slimmdree
Josie
Posts: 31
Joined: Friday 30 December, 2011 - 09:40

Re: Modelling a production line with two advance transporter

Post by Josie »

Dear Slimmdree,

In your model, bidirectional linkages between network nodes are missing:
19 to 24,
18 to 24,
25 to 20,
25 to 21.
As a result, the transporter cannot find the next destination node after it gets product, and the access violation messages pop up.

To solve it, you need to disconnect the linkage between network nodes 18 and 19, then link 19 to 24 and 18 to 24. The same happens to network nodes 20 and 21.
Hope these will help.

Good luck!
Post Reply