Quality Control (Sampling)
-
- Posts: 5
- Joined: Thursday 19 June, 2014 - 08:52
Quality Control (Sampling)
Please read the attached file and help me to solve this problem.Thanks
- Attachments
-
- Quality Control(Sampling).pdf
- (174.52 KiB) Downloaded 418 times
-
- Posts: 3
- Joined: Friday 13 June, 2014 - 08:50
Re: Quality Control (Sampling)
hi ed community,
I need to answer this question.
tnx.
I need to answer this question.
tnx.
Re: Quality Control (Sampling)
Hi Hesam Adrang,
Could you please be more specific? What are the problems you encounter while building your model?
If you want to learn how to model in ED please consider the ED tutorials:
http://academy.incontrolsim.com/documen ... ation.html
Regards, Nick
Could you please be more specific? What are the problems you encounter while building your model?
If you want to learn how to model in ED please consider the ED tutorials:
http://academy.incontrolsim.com/documen ... ation.html
Regards, Nick
-
- Posts: 5
- Joined: Thursday 19 June, 2014 - 08:52
Re: Quality Control (Sampling)
Suppose we have a milling machine to produce pipes with specific diameter.
Pipe diameter: Normal (100, 0.1)
Cycle time: Triangular (0.7, 1, 1.2)
My first question is, where and how to write 4Dscript code for the pipe diameter with a normal distribution?
Pipe diameter: Normal (100, 0.1)
Cycle time: Triangular (0.7, 1, 1.2)
My first question is, where and how to write 4Dscript code for the pipe diameter with a normal distribution?
-
- Posts: 5
- Joined: Thursday 19 June, 2014 - 08:52
Re: Quality Control (Sampling)
Sorry it was turning machine not milling machine.
Now, after turning, the parts are tested for quality control diameter every two hours.
In fact, every two hours we inspect 10 pipes randomly. If no non-conforming parts is not found, the lot is sent to the next stage else the entire lot will be inspected and only good parts are sent to the next stage and defective parts are sent to the waste storage.
non-conforming parts mean that we should produce pipe diameter in the standard range.
Standard range of diameter (USL & LSL): (upper bound=103 and lower bound=97) millimeters
Note: Consider the 8-hour working day.
Now my second question is, where and how to write 4Dscript code for this inspection?
Now, after turning, the parts are tested for quality control diameter every two hours.
In fact, every two hours we inspect 10 pipes randomly. If no non-conforming parts is not found, the lot is sent to the next stage else the entire lot will be inspected and only good parts are sent to the next stage and defective parts are sent to the waste storage.
non-conforming parts mean that we should produce pipe diameter in the standard range.
Standard range of diameter (USL & LSL): (upper bound=103 and lower bound=97) millimeters
Note: Consider the 8-hour working day.
Now my second question is, where and how to write 4Dscript code for this inspection?
-
- Posts: 5
- Joined: Thursday 19 June, 2014 - 08:52
Re: Quality Control (Sampling)
I am impatiently waiting for answer.
Re: Quality Control (Sampling)
Hi,
If you could post your model, and elaborate a bit more of the difficulties you encounter, this forum might be able to help you further.
Kind regards,
Menno
If you could post your model, and elaborate a bit more of the difficulties you encounter, this forum might be able to help you further.
Kind regards,
Menno