Hi Community,

I am modeling an earthwork process in ED for a project and i have a technical Problem in the Model.

1) My objective is to optimize to the Speed of the Advanced Transporter in the netwok. I am comparing the total simualtion time with single Speed(30kmph) and 3 different Speeds (30kmph, 20kmph, 10kmph) with in the Network, i can edit the Speed limit in the node but the Problem is total Simulation time is not variying with single Speed & three different Speeds in the Network.??

2) In the model i have a conflict Zone, and i need to model it in such a way that at a time ony one truck has to be there in the conflict Zone ( in other words on truck has to wait at the entrance of conflict Zone till the other truck Exit the conflict Zone), but this is not happening in the Model.

I am attaching the model,
Thanks in advance...
Attachments
Earthwork7.mod
(117.16 KiB) Downloaded 197 times
User avatar
MatthijsJongboer
Posts: 200
Joined: Thursday 11 November, 2010 - 14:12

Re: Optimize the speed of Advanced Transporter

Post by MatthijsJongboer »

Hi Nunepalli,
It seems you are working on the same project as poso9384.
I have presented a tip on both your questions here: https://community.incontrolsim.com/view ... ?f=7&t=887