Hello Harry,
Attached my model without availability,if running it for one hour,number of routing and it's label are linked correctly by summary report but no average stay time ,no servers and queue are utilized,what is wrong with my simulation and cycle time table link.
Many thanks
Search found 4 matches
- Saturday 24 January, 2015 - 00:13
- Forum: Modeling in Enterprise Dynamics
- Topic: Query about Job Shop Simulation Model
- Replies: 3
- Views: 5588
- Friday 23 January, 2015 - 19:50
- Forum: Modeling in Enterprise Dynamics
- Topic: Simulating Multiple Cycle Time and Setup Time in One Server
- Replies: 3
- Views: 6101
Re: Simulating Multiple Cycle Time and Setup Time in One Server
Thanks Harry Attached my simple Model,i want to produce cap 1 to cap 5 with quantity 10000 pc for each one as mentioned in the arrival list atom.When finish producing cap 1 then cap 2 quantity is sent automatically to the server and so on.for cap 1 the cycle time is 3s/pc ,for cap 2 cycle time is 4s...
- Thursday 22 January, 2015 - 23:06
- Forum: Modeling in Enterprise Dynamics
- Topic: Query about Job Shop Simulation Model
- Replies: 3
- Views: 5588
Query about Job Shop Simulation Model
Hi Attached a simplified job shop model,i put routing and cycle times tables. Whenever i do simulation by Run Control for the same period of time ,i get different results(summary report) for average stay time ,i don't have any exponential time or variable time ,please run it (several times) for 5000...
- Thursday 22 January, 2015 - 22:19
- Forum: Modeling in Enterprise Dynamics
- Topic: Simulating Multiple Cycle Time and Setup Time in One Server
- Replies: 3
- Views: 6101
Simulating Multiple Cycle Time and Setup Time in One Server
Hi, Please i need help regarding the following i have five products for example,they go to queue then server then sink(very simple model) i used Arriving list to put these products inside it,i set different arriving time inside the Arriving list for these products ,how can i put different cycle time...